Fig. 1 & Fig. 2. The sand base.
Fig. 1. 14/01/2016 |
Fig. 2. 14/01/2016 |
Fig. 3 & Fig. 4. The plastic is down.
Fig. 3. 16/01/2016 |
Fig. 4. 16/01/2016 |
Fig. 5 & Fig. 6. A work in progress of the leveling. We had boards on either side of the shed walls and a string line in the center, using a board between the two we got it reasonably level a half at a time.
Fig. 5. 16/01/2016 |
Fig. 6. 16/01/2016 |
Fig. 7 & Fig. 8. All nice and smooth, just waiting for it to dry.
Fig. 7. 16/01/2016 |
Fig. 8. 16/01/2016 |
Fig. 9. The sub is back in, level, and ready for work. The next part to finish is the Elevator and Diving Controls.
Fig. 9. 19/01/2016 |
No comments:
Post a Comment